25,000 to 30,000 sq ft, targeted for 2027 to early 2028
Phase 2 is under development on the park's remaining land. A tenant who commits before the design stage gets a built-to-suit building, with clear height, bay sizing, dock count, floor load and power settled together. Otherwise it is delivered as a ready-built Grade A unit to the same specification as Phase 1.